MF-142 Structural schematic showing cable and rib clearance options.
Anchors for threaded rod.
Pin connection supports the top edge of the laminated glass.
An early structural model for cable system deployed in OE-15
Laminated glass plane supports live load.
W-120301
Laminated glass plane supports live-load.
MF-142 Load bearing structure.
Stress analysis of glass supported on 2 edges.
Drawings for rib fabrication and assembly.
MF-142 A model reveals the interior structure sandwiched between the exterior skins.
D-33 Stress analysis of glass supported on 3 edges.
Rib assembly.
Load analysis for sloped glass.
P-131317